The Pentagon flew Valar's unfueled reactor; no Defense Department contract with Valar was found in federal spending records
Stars and Stripes (17 Feb 2026) reports the 15 February 2026 airlift, called Operation Windlord, which moved Ward 250 modules on Air Force C-17s from March Air Reserve Base, California, to Hill Air Force Base, Utah, with Energy Secretary Chris Wright taking part; it states that the '5 megawatt nuclear reactor could theoretically power about 5,000 homes'. That is far above the 100 kWt test power the safety agreement allows (orig-030, orig-031); 5 MW matches the size the state lab's Valar page says the design is meant to 'scale up to' (gov-026), not Ward 250 as flown. The Air Force's own article on the reservists who supported the flight (af.mil) could not be retrieved. A USAspending search of all award types (fiscal 2021 to 30 September 2026) found no Defense Department contract, grant or other award to Valar (orig-055, gov-003), and none of Valar's lobbying reports lists the Defense Department as contacted (gov-004). Who paid for the flights is not stated in any government record read; a Wall Street Journal report cited elsewhere on this site could not be read. The Army's own reactor program under EO 14299 (gov-009) is separate; no record read ties Valar to it.
- Air Force C-17 Globemaster III aircraft airlift nuclear reactor in a first-of-its-kind mission (Stars and Stripes, 2026-02-17) news “The 5 megawatt nuclear reactor could theoretically power about 5,000 homes.”
- USAspending award search, recipient 'VALAR ATOMICS', all prime award types, FY2021-FY2026 ( run in late September 2026; 1 result, the DOE OTA) (USAspending.gov) primary government
- Valar Atomics | Utah San Rafael Energy Lab (Utah San Rafael Energy Lab (Utah Office of Energy Development)) “It is ultimately designed to scale up to a 5 MW design”
Code: gov-027 · short link: valarwatch.com/gov-027
In tabs: Connections to Government, Timeline, Funding