Research Brief
What is new: the latest research brief, the top conflicts and the newest facts, each with its date.
Claims vs Record: 44 open entries (the first 8 shown)
- documented conflict Ward 250's fuel: Valar's safety agreement lists 4.95% uranium; its Los Alamos release and DOE's shipping review say HALEU
- documented conflict 'No dose at the site boundary', said the state lab director; Valar's own worst case gives a small dose there, judged against non-zero guideline figures
- documented conflict Who oversees the reactor: the governor spoke of the NRC and the state lab's FAQ still promises NRC licenses; the record, and Valar's own papers, say DOE alone
- documented conflict State documents: 'full-power' criticality on 18 June and full power on 21 June; DOE and Valar itself describe 18 June as a zero-power test
- documented conflict Carbon site: first public record tying Valar to Section 16 is the 10 Aug 2026 agenda; Valar's April 'open with all plans' was said at the Emery parcel hearing
- documented conflict 'Not trying to keep anything from anyone', said the lab director; the state's MOU with Valar said it and related information were confidential, except as required by law; the energy office uses similar terms with some other nuclear companies
- documented conflict Valar's safety agreement commits to state-permit compliance; district minutes record a staff report of a sewer tie-in 'without prior authorization'
- documented conflict 'The first company ever to take a nuclear reactor critical outside of a national lab': General Atomics did it in 1958
Records added by the latest research, each checked against its sources.
- safe-010 DOE shipping review: fuel for Ward 250 is HALEU (under 20%), not the 4.95% its safety agreement lists
- safe-026 'CAT scan' spent-fuel claim still on Valar's site in late September 2026; no supporting calculation or correction found there
- csite-032 The state's first public notice of the lease (RDCC, April 20, 2026) called it an industrial and power project; no nuclear, no name
- mine-013 Carbon commissioners signed a June 29 support letter; no Carbon County agenda read from May to mid-Sept shows it or the site
- safe-014 Valar's draft accident math puts the nearest public access 400 m away; the host lab is 20.6 acres, too small to hold a 400 m radius
- safe-016 Emergency planning: Valar asked to plan for on-site emergencies only; no public record found shows DOE agreed
- safe-007 What DOE has made public about Ward 250 safety, and what was not found: no DSA, TSRs, SER or startup approval, though DOE says its teams reviewed Ward 250's readiness before startup
- safe-009 The accident analysis assumed 3 megawatt-days of fuel use; the same document's limit allows 30, ten times more
- plan-009 Dates clash: full power on June 21 in the state's lease memo, yet on June 22 Valar announced 10 kWt of 100
- safe-031 A uranium fuel line is being set up beside Ward 250; no DOE safety authorization for it was found in public records
- gov-026 State lab's FAQ says 'the planned reactor' gets NRC licensing and NRC-tested operators; its working reactor has neither
- gov-011 The state's earliest agreement with Valar found in public records (May 16, 2025) made it and 'related information' confidential, except as required by law, and barred publicity without consent; the energy office uses similar terms with some other nuclear companies
- csite-024 Utah approved up to $106.7M in tax credits for Valar in July 2026 (Emery County); like all 13 tax-credit applicants the board took up from April to September 2026, it was not named on the public agenda
- safe-039 What holds up: DOE did authorize the reactor, the airlift was unfueled, DOE checked the fuel's shipping package, DOE rates TRISO fuel more resistant than ordinary fuel
New facts (first seen after October 16, 2026): 9
In the Mine Safety and Health Administration's (MSHA) mine data (file dated 16 October 2026, read 19 October 2026), three coal operations not listed as abandoned have listed locations within 25 km of Emery County parcel 04-0019-0030, next to the lab. Fossil Rock Mine (operator Fossil Rock Resources, LLC; nearest town Orangeville) is an underground mine with status Active since 4 September 2024; it reported no coal production in 2023, 44,687 tons in 2024, 575,268 in 2025 and 778,974 in 2026 to date (a partial year). Its mine information form gives 254 workers; its yearly data give an average of 301 employees for 2026 to date (274 underground and 27 on the surface). Gentry Mine #3 (operator Altius Construction LLC), underground, about 18 km north, has status NonProducing since 24 November 2025; it reported 419,592 tons in 2023, 292,122 in 2024, 139,408 in 2025 and 529 in 2026 to date. The Hunter Prep Plant, a coal facility, is listed as Active since 15 September 2015, with no coal production reported. The other coal entries MSHA lists in that radius are all Abandoned or Abandoned and Sealed. Farther out, the nearest underground coal mines listed as Active are Emery Valley Mine (about 42 km south; 798,033 tons in 2023, 1,064,605 in 2024, 936,272 in 2025 and 403,005 in 2026 to date), SUFCO (about 46 km southwest) and Skyline Mine #3 (about 50 km north). Distances run from the parcel's centre, placed from its legal description in the Utah Inland Port Authority's project plan and the Bureau of Land Management's survey grid for Section 24, to MSHA's listed coordinates, which are approximate. No distance or direction is given for Fossil Rock Mine, whose listed point falls about 1.5 km outside Emery County, the county MSHA lists it in, on the Bureau of Land Management's county lines; MSHA's directions give an address on Cottonwood Canyon Road, Orangeville. None is given for the Hunter Prep Plant either; MSHA's directions place it '4 miles SW of Castle Dale'. Not a legal survey. ANS's Nuclear Newswire describes the site as 'flanked by gigawatt-scale coal stations and active coal mines'; these figures are set beside that description, not offered as a test of it.
- MSHA Mines data set (Mines.txt, file dated 16 October 2026): mine status, status date, operator, type, workers and listed coordinates (U.S. Department of Labor, Mine Safety and Health Administration, 2026-10-16) primary government
- MSHA Employment/Production (Yearly) data set (file dated 16 October 2026; 2026 is a partial year) (U.S. Department of Labor, Mine Safety and Health Administration, 2026-10-16) primary government
- MSHA Mines data set definition file (U.S. Department of Labor, Mine Safety and Health Administration) primary government “Entered on the Mine Information Form (MIF).”
- MSHA Employment/Production (Yearly) definition file (U.S. Department of Labor, Mine Safety and Health Administration) primary government “The average of the quarterly average employee count”
- MSHA Employment/Production (Quarterly) definition file (U.S. Department of Labor, Mine Safety and Health Administration) primary government “Quarterly coal production, in tons, reported by the operator for the applicable subunit.”
- Castle Country, A Utah Inland Port Project Area: Project Area Plan and Budget, Amendment #3 (parcel descriptions) (Utah Inland Port Authority (Utah Public Notice Website), 2026-05-21) primary government “A part of Section 24, Township 18 South, Range 7 East”
- BLM National PLSS (CadNSDI), PLSS Section layer: sections of T17S-T19S R7E and T18S R8E, Salt Lake Meridian (Sec. 24 T18S R7E) (U.S. Bureau of Land Management) primary government
- BLM National PLSS (CadNSDI), PLSS Intersected layer: aliquot parts of Secs. 13, 23, 24 and 25, T18S R7E, Salt Lake Meridian (U.S. Bureau of Land Management) primary government
- Emery County Commission Meeting Minutes, January 20, 2026 (Emery County Commission (Utah Public Notice Website), 2026-01-20) primary government “the property next to the Research Center”
- BOC National County Boundaries (Utah county lines, as pulled in late September 2026) (U.S. Bureau of Land Management) primary government
- Valar's Ward 250 reaches criticality in Utah (American Nuclear Society, Nuclear Newswire, 2026-06-22) news “flanked by gigawatt-scale coal stations and active coal mines”
Valar's Castle Country page (valaratomics.com/castle-country) carried a new section headed 'FAQ' and 'Common Questions' in the copy saved on 16 October 2026, with a matching 'FAQ' link near the top of the page. It lists 34 questions in ten groups: the basics; the reactor and how it works; the land and the deal; money and taxes; jobs and working for Valar; power, customers and bills; water; heat, land and environment; safety and spent fuel; and what happens next. The page shows each question with its answer. The copy of the page saved in late September 2026 has no FAQ section; in its place it shows a timeline of energy in Castle Country that begins with the Gunnison Expedition's 1853 record of coal seams. A copy saved on 17 October 2026 is identical to the 16 October copy. The section closes with Valar's own caveat: 'These FAQs include estimates and plans.', adding that they may change through regulatory review or permitting and that final safety, authorization and licensing decisions rest with the regulators. The saved copies show that the FAQ appeared between 29 September and 16 October 2026; they do not show the day it was posted. The FAQ is Valar's own account. Six of its answers are set beside the public record in faq-002 (tax incentives), faq-003 (the lease), faq-004 (jobs), faq-005 (spent fuel), faq-006 (grazing) and faq-007 (customers and power bills).
- Castle Country | Valar Atomics (page with the 'Common Questions' FAQ) (Valar Atomics) primary company “These FAQs include estimates and plans.”
- Castle Country page: FAQ answers (as published 16 October 2026) (Valar Atomics) primary company “Coal and nuclear power plants do the same basic job”
- Castle Country | Valar Atomics (copy of 29 September 2026, before the FAQ) (Valar Atomics) primary company
Valar's public job board feed (Greenhouse) listed 92 openings when read in late September 2026: 71 in Torrance, California and 21 in Orangeville, Utah. Read on 16 October 2026 it listed 101: 81 in Torrance and 20 in Orangeville; the 17 October 2026 reading listed the same 101 openings. Between the 29 September and 16 October readings, 71 openings stayed, 21 left the board (17 in Torrance, 4 in Orangeville) and 30 were added (27 in Torrance, 3 in Orangeville): 92 - 21 + 30 = 101, counted post by post (four Torrance job titles appear both among the posts that left and among those added). The Orangeville posts no longer listed on 16 October were a Development and Construction Finance Director, a Director of People Operations, a Site Environmental Health and Safety Specialist and a Staff Controls Software Engineer; the Orangeville posts added were an IT Engineer, a Senior Scheduler and an Infrastructure Project Manager, which the feed shows as first published on 1, 5 and 9 October 2026. A post that leaves the board does not show whether the role was filled or dropped, and a first-published date can reflect a repost. In none of the three readings was an opening located in Carbon County, Price or Wellington, and no posting's text mentions Carbon County or Wellington. Openings are not employees: the board does not show how many people Valar employs (loc-004, faq-004). Job boards change daily; these counts are as of the dates given. Earlier readings of the same board are in loc-019 and plan-011.
- Valar Atomics job board (public Greenhouse feed; 92 postings on 29 September 2026, 101 on 16 and 17 October 2026) (Valar Atomics (via Greenhouse)) primary company “Infrastructure Project Manager”
The FAQ (as of 16 October 2026) says the Trust Lands board voted unanimously on 17 September, in open session, to lease Valar 'about 640 acres of school trust land east of the Price airport', after 'a published board memo, two public board meetings, and a public comment period'; that 'Valar pays $400,000 up front', then yearly rent that steps up, and 'roughly $35 million to the trust over 50 years', from land that previously earned the schools about $200,000 over the same period (another answer gives about $4,000 a year); and that the term is 50 years with 'two optional 25-year extensions that have to be earned'. Where the record supports Valar: the board memorandum in the 17 September 2026 packet lists an upfront bonus of $400,000 due on execution; rent of $30 per acre in years 1-5, $206.25 in year 6, $418.75 in year 7 and $625 in years 8-10, with a CPI-based increase in year 11 and every five years after; and an initial term of 50 years with two optional 25-year extensions, 'provided the lease remains in good standing'. The memo says staff presented the proposal to the full board on 20 August 2026, when the board accepted public comments, before the 17 September vote; the board's published transcript of that meeting records a motion to approve 'on the terms set forth in the board memorandum' and the chair calling the vote unanimous. The memo calls the parcel's past income 'approximately $4,000 per year', which matches the FAQ ($4,000 x 50 years = $200,000). Two other records differ: the board's final minutes of 20 August 2026 record staff saying the parcel yields 'approximately $4,000 per month' from the Utah National Guard, and the board's published transcript of that meeting gives '$4,000 and some change' with no period stated; no record read explains the difference. Set beside the answer: the memo covers up to 640 acres, but the lease would include the 480 acres not under a Utah National Guard lease, with the other 160 acres added later only if that lease is moved. The memo gives no 50-year total, but the Trust Lands staff slides shown to the board on 20 August and 17 September 2026 do: 'Approximately $35,000,000 in lease rents over 50 years' (17 September), and 'approximately $35 million' (20 August). The FAQ's figure is that state projection; the slides do not say what acreage or inflation rate it assumes. This site's arithmetic, using the memo's rent schedule and the 3% a year CPI assumption the memo uses for its purchase price, applied in five-year steps from year 11: bonus plus 50 years of rent comes to $35,024,420 on 640 acres and $26,368,315 on 480 acres; with no CPI increase, $18,096,000 and $13,672,000. Actual CPI and the memo's possible appraisal resets after year 25 would change these totals, and the memo's purchase option could end rent early. On that arithmetic, the $35 million in the slides and the FAQ corresponds to the full 640 acres with 3% inflation, not to the 480 acres the lease would cover at the start. The memo places the parcel about five miles north of Wellington; the FAQ's 'east of the Price airport' was not checked against a saved map record.
- Castle Country page: FAQ answers (as published 16 October 2026) (Valar Atomics) primary company “roughly $35 million to the trust over 50 years”
- Castle Country | Valar Atomics (page with the 'Common Questions' FAQ) (Valar Atomics) primary company “What exactly did Valar get approved for?”
- 09.17.2026 TLA Board Packet, Item 10A: SULA 2095-OBA Board of Trustees Memorandum (payment terms, PDF p.24) (Utah Trust Lands Administration (Utah Public Notice Website), 2026-09-17) primary government “An upfront bonus payment of $400,000, due upon agreement execution”
- 09.17.2026 TLA Board Packet, Item 10A: SULA 2095-OBA Board of Trustees Memorandum (purchase option, PDF p.25) (Utah Trust Lands Administration (Utah Public Notice Website), 2026-09-17) primary government “a projected annual CPI increase of 3%, adjusted every five years”
- 09.17.2026 TLA Board Packet, Item 10A: SULA 2095-OBA Board of Trustees Memorandum (subject property, PDF p.20) (Utah Trust Lands Administration (Utah Public Notice Website), 2026-09-17) primary government “include the 480-acre portion of the subject property”
- 09.17.2026 TLA Board Packet, Item 10A: SULA 2095-OBA Board of Trustees Memorandum (staff recommendation) (Utah Trust Lands Administration (Utah Public Notice Website), 2026-09-17) primary government “heretofore generated little income (approximately $4,000 per year)”
- 09.17.2026 TLA Board of Trustees Meeting Audio Transcript (auto-generated) (Utah Trust Lands Administration (Utah Public Notice Website), 2026-09-17) primary government “move to approve. Sula 2095 OBA on the terms set forth in the board memorandum”
- 08.20.2026 FINAL TLA Minutes (Utah Trust Lands Administration (Utah Public Notice Website), 2026-09-17) primary government “approximately $4,000 per month from the Utah National Guard”
- 2026-08-20 TLA Board of Trustees Meeting Audio Transcript (auto-generated) (Utah Trust Lands Administration (Utah Public Notice Website), 2026-08-20) primary government “Right now, we are making $4,000 and some change.”
- TLA September 17 Board Meeting Presentation (Item 10A slides: SULA 2095 OBA) (Utah Trust Lands Administration (Utah Public Notice Website), 2026-09-18) primary government “Approximately $35,000,000 in lease rents over 50 years”
- TLA Board of Trustees meeting presentation, August 20, 2026 (Item 9A slides: SULA 2095 OBA) (Utah Trust Lands Administration (Utah Public Notice Website), 2026-08-20) primary government “The projected 50-year revenue to the Trust is approximately $35 million”
Asked whether Valar is getting local tax incentives, the FAQ (as of 16 October 2026) answers 'No.' and 'We haven’t asked either county for a single tax incentive, and we won’t.', adding that 'Industry carrying its share of the tax base' is how the burden comes off homeowners. Where the record supports Valar: the minutes of the Emery County Commission's 7 April 2026 hearing on selling a county parcel to Valar record that, asked what incentives the county had given Valar, 'The answer is None', and that Commissioner Keven Jensen said Valar had 'not even asked for any tax incentive'. At the Carbon County Planning Commission on 6 October 2026 a Valar speaker said the company did not need or want tax incentives ('We don't need it'; county recording, about 1:29:05). Set beside the answer: the materials for the 9 July 2026 board meeting of the Governor's Office of Economic Development (GOED) recommend Valar Atomics Inc. for a state post-performance refundable tax credit (REDTIF) of up to $106,737,499 over 10 years for an Emery County project, and list among its conditions that 'Incentives are site specific and subject to local incentive participation' and that a local incentive proposal must be approved by GOED's Incentives Committee for the company to be eligible; the board approved the credit that day (csite-024). The FAQ answer speaks of the two counties and does not mention the state credit. No local incentive proposal for Valar was found in the records this site has saved, as of 17 October 2026, and no record read says how the local-participation condition would be met or whether Valar intends to claim the credit.
- Castle Country page: FAQ answers (as published 16 October 2026) (Valar Atomics) primary company “We haven’t asked either county for a single tax incentive, and we won’t.”
- Castle Country | Valar Atomics (page with the 'Common Questions' FAQ) (Valar Atomics) primary company “Money & Taxes”
- Emery County Commission Meeting Minutes, April 7, 2026 (public hearing on sale of parcel 04-0019-0030) (Emery County Commission (Utah Public Notice Website), 2026-04-07) primary government “they have not even asked for any tax incentive”
- GOED Public Board Materials, July 9, 2026: GOED Board Executive Summary and Proposed Motion, Valar Atomics Inc. (Board of the Governor's Office of Economic Development (Utah Public Notice Website), 2026-07-09) primary government “Incentives are site specific and subject to local incentive participation.”
- GOED Board Meeting Minutes, July 9, 2026 (posted with the Sept 10, 2026 meeting) (Board of the Governor's Office of Economic Development (Utah Public Notice Website), 2026-09-10) primary government
- Carbon County Planning Commission, October 6, 2026: audio recording of the meeting (posted October 7, 2026), at about 1:29:05 (Carbon County Planning Commission (Utah Public Notice Website), 2026-10-07) primary government
The FAQ (as of 16 October 2026) says 'More than 100 of our neighbors in Emery and Carbon county work full time' at Valar today, lists trades from welders and operators to cooks and office staff, and expects the Carbon project to create 'hundreds of good paying jobs in Carbon County'. Valar's own earlier figures, in order: on 15 April 2026 Ferron's council minutes record Valar's Jess Housekeeper saying 'We actively employ 120 people. A lot of those are NOT living in Utah.', with 15-20 full-time employees at the site; the Trust Lands board's final minutes of 20 August 2026 record Valar's Max Ukropina and Housekeeper saying the current facility 'employs roughly 40 full-time local residents' and uses 50 to several hundred local contractors; at the Carbon County Planning Commission on 6 October 2026, Valar's presenters gave about 90 people on site, 70 of them local and 20 brought in (county recording, about 1:04:38 to 1:07:17), and a Valar speaker said 'we currently employ 70 locals' in Emery County (about 1:14:49). The FAQ's 'more than 100' full-time local figure is higher than any full-time local figure Valar gave in those records. The figures may count different groups (staff, contractors, residents of which counties); the records read do not say how the FAQ counts 'neighbors' or 'full time'. No payroll or headcount filing was found in the records this site has saved, as of 17 October 2026. On the Carbon jobs, the record is consistent with Valar's answer as a forecast: on 6 October a Valar speaker said the project 'can fall apart' but, if it worked out, would mean hundreds of jobs (about 1:00:13 to 1:01:35). No job figure for the Carbon campus appears in the Trust Lands records read; the only formal job projection found, 275 jobs, is for Valar's Emery County project under its state tax credit (fund-017). Openings on Valar's job board are a separate count (upd-001).
- Castle Country page: FAQ answers (as published 16 October 2026) (Valar Atomics) primary company “More than 100 of our neighbors in Emery and Carbon county work full time”
- Castle Country | Valar Atomics (page with the 'Common Questions' FAQ) (Valar Atomics) primary company “Are the jobs real, and are they for us?”
- Ferron City Council Minutes, April 15, 2026 (scanned) (Ferron City (Utah Public Notice Website), 2026-04-15) primary government “We actively employ 120 people. A lot of those are NOT living in Utah.”
- 08.20.2026 FINAL TLA Minutes (Utah Trust Lands Administration (Utah Public Notice Website), 2026-09-17) primary government “employs roughly 40 full-time local residents”
- Carbon County Planning Commission, October 6, 2026: audio recording of the meeting (posted October 7, 2026), at about 1:00:13, 1:04:38 and 1:14:49 (Carbon County Planning Commission (Utah Public Notice Website), 2026-10-07) primary government
The FAQ (as of 16 October 2026) says 'We plan to store spent fuel on or near our site in dry casks' until the federal government 'is able to receive it for long-term disposal'. ETV News reported Valar officials saying much the same at Valar's 29 September 2026 town hall in Price (csite-008). Set beside it: the Trust Lands staff slides shown to the board on 20 August 2026 list among 'Safeguards' that 'Storage of nuclear waste is strictly prohibited on the lease'; the board memorandum in the 17 September 2026 packet says Valar would have to buy any portion of the property needed for the interim storage of spent fuel before any storage operations, that storage of spent fuel is not allowed on Trust Lands property under the agreement, and that any such activity would need the applicable federal and state licenses, permits and approvals first. Where the record supports Valar: storage near the site on land Valar has bought is the route the memo's terms provide for, so the FAQ's plan does not conflict with the lease terms as written. State law: Utah Code 19-3-301 prohibits placing high-level nuclear waste or greater than class C radioactive waste in Utah unless the governor, with the Legislature's concurrence, approves it under set conditions; 2026 H.B. 78 exempts interim storage of waste from a DOE-authorized test reactor only when it is produced at a facility owned by the state and the project is permitted and licensed by the state's radiation division. Whether Utah's restriction would apply to spent fuel kept at a private Carbon County campus is not answered in any record read, as of 17 October 2026 (csite-008). The FAQ answer does not mention the lease terms or the state law. Its statement that this is the approach of the other operating US reactors was not checked.
- Castle Country page: FAQ answers (as published 16 October 2026) (Valar Atomics) primary company “We plan to store spent fuel on or near our site in dry casks”
- Castle Country | Valar Atomics (page with the 'Common Questions' FAQ) (Valar Atomics) primary company “Will nuclear waste be stored near our homes?”
- TLA Board of Trustees meeting presentation, August 20, 2026 (Item 9A slides: SULA 2095 OBA) (Utah Trust Lands Administration (Utah Public Notice Website), 2026-08-20) primary government “Storage of nuclear waste is strictly prohibited on the lease”
- 09.17.2026 TLA Board Packet, Item 10A: SULA 2095-OBA Board of Trustees Memorandum (spent fuel storage and radioactive waste, PDF p.22) (Utah Trust Lands Administration (Utah Public Notice Website), 2026-09-17) primary government “storage of any spent fuel is not allowed on TLA property”
- Utah Code 19-3-301: Restrictions on nuclear waste placement in state (Utah State Legislature) primary government “high-level nuclear waste or greater than class C radioactive waste is prohibited”
- H.B. 78 Nuclear Regulatory Amendments, 2026 General Session, Enrolled Copy (Utah State Legislature) primary government “is produced at a facility owned by the state”
Answering a question about grazing permits on the BLM land, the FAQ (as of 16 October 2026) says the grazing permit is between the Trust Lands Administration and the permit holder, that the trust has 'committed to an avenue that would allow the leaseholders to graze as long as possible' while development happens, 'and even when it’s complete in some cases', and that Valar has been in contact with the people and families who hold grazing permits in the area. Set beside it: the board memorandum in the 17 September 2026 packet lists a livestock grazing permit among the current authorizations on the 640-acre section and says that, prior to construction, the permit would be terminated per agency rules and the permit's terms, with as much notice as possible to the permittee. That is consistent with grazing continuing until construction begins. No record read describes grazing continuing during or after construction on the section, or a Trust Lands commitment in the FAQ's words, as of 17 October 2026. Valar's contact with permit holders is not in any record read, either way. The FAQ answer speaks of the trust-land permit although the question asks about BLM land; grazing permits on BLM land around the section were not checked. Permit holders are private people and are not named here.
- Castle Country page: FAQ answers (as published 16 October 2026) (Valar Atomics) primary company “committed to an avenue that would allow the leaseholders to graze as long as possible”
- Castle Country | Valar Atomics (page with the 'Common Questions' FAQ) (Valar Atomics) primary company “What about the grazing permits on the BLM land?”
- 09.17.2026 TLA Board Packet, Item 10A: SULA 2095-OBA Board of Trustees Memorandum (subject property, PDF p.20) (Utah Trust Lands Administration (Utah Public Notice Website), 2026-09-17) primary government “TLA will provide as much notice as possible to the permittee prior to termination.”
The FAQ (as of 16 October 2026) says 'We don’t have any agreements with tenants yet', that data centers are 'the most likely first customer' of its power, and that other customers such as manufacturing and metals may follow. The Trust Lands staff slides of 17 September 2026 likewise say power generation 'will support multiple onsite commercial activities', which may include data centers and steel manufacturing among others. It says the campus makes its own power on site, 'separate from the grid that serves homes and small businesses', so local power bills would not pay for it, and that any future grid connection 'would need to be approved by the public utility process'. Where the record supports Valar: no power purchase agreement, utility contract or named customer for Valar was found in the records this site has saved, as of 17 October 2026, which matches the FAQ's own statement. In June 2026 Orangeville's council minutes record that, during public comments by Valar's representative, the council asked whether 'this energy' was being used for data centers, and that data centers could be buyers but 'the energy does not currently have a set destination or purchaser'; the minutes do not say which site's power was meant. At the Carbon County Planning Commission on 6 October 2026 a Valar speaker said the plan for the parcel is to build reactors and have customers come in and use the power, and that whether Valar may feed power back to the community is up to the utility system (county recording, about 1:13:48 to 1:15:45). An announced study with NVIDIA is described in plan-010. The FAQ's statement about power bills describes a design in which the campus is not connected to the public grid; no utility-rate filing naming Valar was found in the records this site has saved, as of 17 October 2026, to test it either way.
- Castle Country page: FAQ answers (as published 16 October 2026) (Valar Atomics) primary company “We don’t have any agreements with tenants yet”
- Castle Country | Valar Atomics (page with the 'Common Questions' FAQ) (Valar Atomics) primary company “Are data centers the only thing that will be powered?”
- Orangeville City Council Regular Meeting Minutes, June 11, 2026 (Orangeville City (Utah Public Notice Website), 2026-06-11) primary government “the energy does not currently have a set destination or purchaser”
- Carbon County Planning Commission, October 6, 2026: audio recording of the meeting (posted October 7, 2026), at about 1:13:48 to 1:15:45 (Carbon County Planning Commission (Utah Public Notice Website), 2026-10-07) primary government
- TLA September 17 Board Meeting Presentation (Item 10A slides: SULA 2095 OBA) (Utah Trust Lands Administration (Utah Public Notice Website), 2026-09-18) primary government “Power generation will support multiple onsite commercial activities”