Utah's energy-lab page calls June 18 'full-power' criticality; DOE and ANS called it zero-power
The Utah San Rafael Energy Lab's project page (a State of Utah site, read in late September 2026) says Ward 250 achieved 'full-power fueled criticality' on June 18, 2026, describes it as a Generation IV helium-cooled, graphite-moderated HTGR, and says the design is meant to scale to a 5 MW version. DOE's release and ANS both describe June 18 as a zero-power criticality demonstration; a DOE slide prepared for the NRC Commission's 21 July 2026 meeting lists 'June 18, 2026 – Criticality achieved (zero power)' and full power on 2 July 2026; and Valar's own Castle Country page says full power came 'days later'. The state page's wording therefore conflicts with the federal record; it also says Valar's design is engineered to 'remain impossible to melt under extreme conditions', which is a design claim, not a demonstrated result.
- Valar Atomics | Utah San Rafael Energy Lab (Utah San Rafael Energy Lab (State of Utah)) primary government “the Ward 250 successfully achieved full-power fueled criticality at the lab”
- Department of Energy Celebrates Second Advanced Reactor Achieving Criticality (U.S. Department of Energy, 2026-06-18) primary government “successfully completed a zero-power fueled criticality demonstration”
- Castle Country | Valar Atomics (Valar Atomics) “it went critical in June, reached full power days later”
- Reactor Pilot Program Update (slides under the name of Theodore J. Garrish, Assistant Secretary for Nuclear Energy, for the NRC Commission meeting 'Advanced Reactor Landscape: Current Status and Moving Forward', 21 July 2026) (U.S. Department of Energy, Office of Nuclear Energy (filed in the NRC's public document system), 2026-07-21) primary government “June 18, 2026 – Criticality achieved (zero power)”
Code: orig-012 · short link: valarwatch.com/orig-012
In tabs: Origins, Connections to Government, Carbon & Emery