Design lineage: 'Ward One' was a 100 kWt TRISO HTGR planned for under a month of operation
The April 2025 lawsuit post describes Ward One as a 100 kWt high-temperature gas reactor using TRISO fuel, named, the founder writes, after a Manhattan Project-era relative of his, with a planned operating life of less than a month. It says the design relies on strong negative thermal reactivity feedback and low power density for fully passive decay-heat removal, and claims that holding its spent fuel for five minutes would give the same radiation exposure as a CAT (CT) scan. The later Ward 250 carries the same 100 kWt figure (orig-011, orig-034), which suggests Ward 250 grew out of the Ward One concept; at its September 29, 2026 town hall Valar said Ward One was renamed Ward 250 (rnm-001). The post says Valar was building and testing Ward One in the Philippines. For scale: a CT scan is about 1 to 10 millisieverts (FDA), so five minutes would need 12 to 120 millisieverts an hour; the post gives no amount of fuel, cooling time, distance or shielding.
- Valar Atomics is Suing the NRC (Valar Atomics, 2025-04-07) primary company “Ward One, a 100kWt High Temperature Gas Reactor using TRISO fuel”
- What are the Radiation Risks from CT? (U.S. Food and Drug Administration, 2017-12-05) primary government “typically estimated to be in the range of 1 to 10 mSv”
- Ward250 Nuclear Safety Design Agreement, No. 100403, Rev 02 (status: Draft; issued for Public Release) (Valar Atomics, 2025-10) primary filing “Maximum continuous power: 100 kWth”
Code: orig-017 · short link: valarwatch.com/orig-017
In tabs: Origins, Timeline, Safety Related Issues