VALAR WATCHTake action

Valar's public document trail: nine web posts, four unlisted, two technical PDFs; the safety analyses are not among them

recordconfirmed
2026-09 · orig-071 · Valar Atomics

Read in late September 2026, the page data behind Valar's Ward 250 page lists nine library posts. Five are listed: 'Valar Atomics is Suing the NRC' (April 7, 2025), 'Roadmap to the American Nuclear Golden Age' (May 23, 2025), the DOE selection post (August 12, 2025), the Project NOVA release (November 18, 2025) and the Series B post (August 4, 2026). Four are not listed but load at their addresses: the Ward250 NSDA post and the QA Program Description post (both dated October 13, 2025), the 'Ward 250 By the Numbers' draft (June 28, 2026, with placeholders) and the 'Ward Zero Whitepaper' (orig-058). The only technical documents found on the site are two PDFs in the site's 'Public Documents' asset folder, the NSDA (document 100403, rev 02, marked Draft) and the QA Program Description (document 100474, rev 02), both linked only from the unlisted posts. Three placeholder posts seen in April 2025, with 'Lorem ipsum' bodies, are gone. Nothing on the site publishes the PDSA, the final DSA, the Technical Safety Requirements, DOE's safety evaluation, the readiness review, the startup approval, the OTA or any Ward Zero test data (safe-007, orig-055, orig-059). The press list's newest entry is dated February 28, 2026 (orig-048), and the Ward 250 page's progress list still stops at the September 2025 groundbreaking.

In plain termsValar's own library of posts and documents fits on one short list: nine web posts, four of them not listed on the library page, and two technical PDFs, one marked 'Draft'. The documents that would show whether the reactor is safe as built, and what DOE required, are not among them. None of the other Valar pages read in late September 2026 links to the four unlisted posts.
verified 2026-10-15: Second check, late September 2026: library and Ward 250 page data re-read: nine posts, four unlisted (NSDA, QA, By the Numbers, Ward Zero Whitepaper), only the NRC post marked noindex; the two PDFs are linked only from the unlisted posts' bodies; NSDA marked 'Draft'; April 2025 archive shows three 'Lorem ipsum' posts, gone by October 2025. Match. Revised before publication (late September 2026): listing wording now 'unlisted'/'not listed'; source title parenthetical now 'unlisted'.

Code: orig-071 · short link: valarwatch.com/orig-071

In tabs: Origins, Safety Related Issues, Public Process