The only power chart from Valar found in public records, as of late September 2026, has no time axis, no power units and no date
Valar's unlisted 'Ward 250 By the Numbers' draft (28 June 2026) embeds a chart titled 'Reactor Power Ascension — TE3401 thermocouples with Q_Total, Power, and Control Bank overlays'. The horizontal axis is 'Sample index' (0 to about 245), not time; no date or clock time appears. A black line 'Q_Total' on a right-hand scale of 0 to 100, labeled 'Q_Total' with no units, rises in steps (about 15, about 52, then about 95 to 100) and then drops to near zero around sample 230, when the 'Control Bank Steps' line also falls to zero, which looks like a shutdown. The ten thermocouple lines (TE3401-094 to -105 in the legend) read between about 30 and 80 degrees Fahrenheit, so they do not look like core temperatures. The title promises a 'Power' overlay that the legend does not show. If Q_Total is in kilowatts, the chart is consistent with a climb to about 100 kW followed by shutdown; the chart itself does not say so, and it cannot show when this happened, for how long, or whether it matches DOE's authorization. A DOE slide prepared for the NRC Commission's 21 July 2026 meeting lists 'July 2, 2026 – full power 100 kWt full power achieved' but gives no data, so it cannot be set against the chart; no DOE operating log or independent power record was found in public records as of 17 October 2026 (plan-006, safe-007).
- Reactor Power Ascension - TE3401 thermocouples with Q_Total, Power, and Control Bank overlays (chart image) (Valar Atomics, 2026-06-28) primary company
- Ward 250 By the Numbers (unlisted draft, dated 28 June 2026) (Valar Atomics, 2026-06-28) primary company
- Reactor Pilot Program Update (slides under the name of Theodore J. Garrish, Assistant Secretary for Nuclear Energy, for the NRC Commission meeting 'Advanced Reactor Landscape: Current Status and Moving Forward', 21 July 2026) (U.S. Department of Energy, Office of Nuclear Energy (filed in the NRC's public document system), 2026-07-21) primary government “July 2, 2026 – full power 100 kWt full power achieved”
Code: plan-007 · short link: valarwatch.com/plan-007
In tabs: Operations, Safety Related Issues