California is the factory: Valar says Ward 250 was heat-tested in Hawthorne; 81 of 101 job posts were in Torrance on 17 Oct 2026
Valar's unlisted, unfinished post dated 28 June 2026 says Ward 250 underwent 'extremely rigorous non-nuclear testing' at its headquarters in Hawthorne, California, before it reached Utah, with temperatures above 750 C and pressures over 6 MPa, thermal cycling and transients; the whole reactor system is six high-cube shipping containers. DOE's Fuel Line Pilot Program page lists the company as 'Valar Atomics Inc. (Hawthorne, California)'. On 29 September 2026 its public job board listed 71 of 92 openings in Torrance, California (on 16 and 17 October 2026, 81 of 101), including a graphite production lead for machining 'reactor components', CNC programmers, machinists, a welding lead for welds to 'nuclear-grade specifications', and eight turbomachinery roles; two posts name Hawthorne as a work base (a Torrance-listed commercial project manager to 'operate in both Hawthorne and Utah', and an Orangeville-listed people-operations director to be based in or relocate to Hawthorne), and a Utah post mentions travel to the 'Los Angeles headquarters'. Read on 16 and 17 October 2026, the board no longer listed the people-operations director post; the commercial project manager post and that Utah post were still listed. The Carbon County claim notice carries a Torrance address (orig-036). In short: reactors and their parts are designed, machined and tested in the Los Angeles area; Utah is where they are fuelled and run. Non-nuclear heat tests are not limited by the nuclear safety limits in the NSDA (a 650 C limit versus 750 C goals, disc-002), so the 750 C figure is not a conflict with them.
- Ward 250 By the Numbers (unlisted, unfinished post, dated 28 June 2026) (Valar Atomics, 2026-06-28) primary company “The system experienced temps above 750c and pressures over 6MPa.”
- Energy Department Fuel Line Pilot Program (U.S. Department of Energy, Office of Nuclear Energy, 2026-02-12) primary government
- Valar Atomics job board (public Greenhouse feed; 92 postings on 29 September 2026, 101 on 16 and 17 October 2026) (Valar Atomics (via Greenhouse), 2026-09) primary company “Graphite is a specialized, abrasive material central to our reactor components”
- Graphite Production Lead (Torrance, California) (Valar Atomics (via Greenhouse), 2026-09) primary company