Customers: no power contract on record; Valar plans behind-the-meter sales, and a Manila utility set talks

recordconfirmed
2026-07-01 · plan-013 · Valar Atomics, Meralco, NVIDIA, Utah Public Service Commission

No power purchase agreement, utility contract or named customer for Valar was found as of late September 2026. What the record shows instead: in June 2026 Valar's public-affairs representative told Orangeville the reactor's energy has no set destination or purchaser (loc-016); in July, the state economic board's minutes record Valar saying its fastest path is to sell power behind the meter (directly to users, not through the grid), aiming in the near term at customers who would pay a higher price, which avoids long waits for grid interconnection (gov-033); in August it told a local business chamber it might build reactors for heavy industrial users, naming a local manufacturer 'strictly as an example' (ETV, 24 August); NVIDIA's role is an announced study (plan-010); and on 17 September, just before the Carbon lease vote, Valar's Harry Hansen told the Trust Lands board that Valar was at the point where site control 'becomes the next conversation when it comes to off-takers', after which it could talk about bringing in buyers for the power (auto-generated meeting transcript). Abroad, Bilyonaryo reported on 2 July 2026 that Meralco, the Philippines' largest electricity distributor, would hold talks with Valar 'in the coming days', according to its chief operating officer, who added that Meralco is open to other small-reactor technologies and that any investment must rest on proven designs. No agreement from those talks was found. No U.S. utility (Rocky Mountain Power/PacifiCorp or others) was found naming Valar in a search of the web; the Utah Public Service Commission's docket site could not be searched. Selling Ward 250's power is outside DOE's research-only basis for authorizing it (safe-030).

In plain termsNobody has signed up to buy power from Valar yet, at least not on any public record. The company's stated near-term plan is to sell electricity directly to big users (factories, data centers) on their own sites; it told a state board that connecting to the power grid is on its roadmap but slower. A large utility in the Philippines said it would talk with Valar. Talks are not a contract.
verified 2026-10-18: Checked in late September 2026: Bilyonaryo re-read: talks 'in the coming days' per Meralco's EVP and COO Ronnie Aperocho; 'largest electricity distributor' is the article's wording. Orangeville minutes, ETV and the TLA auto-transcript quotes hold. psc.utah.gov could not be read. The search for a U.S. utility naming Valar was not repeated at this check. Manila Bulletin and BusinessMirror could not be read and are not used. Revised before publication (late September 2026): a note on how sources were re-read was removed.

Code: plan-013 · short link: valarwatch.com/plan-013

In tabs: Plans & Sites, Operations, Carbon & Emery