VALAR WATCHTake action

Willem Kriel came out of retirement to help lead Valar's engineering (Deseret); a same-named engineer co-wrote a 2006 PBMR paper

recordreported
undated · ppl-007 · Willem Kriel, Valar Atomics, Pebble Bed Modular Reactor (Pty) Ltd

Deseret News (17 Mar 2026, and again 18 Jun 2026) reports that Willem Kriel came out of retirement to help lead Valar's engineering team, and names him with Mark Mitchell and Muhammad Shahzad as experienced hires; it gives no earlier employer. A Willem Kriel co-authored 'PBMR Project - Pebble Fuel Advantages', a paper on South Africa's Pebble Bed Modular Reactor fuel given at a 2006 nuclear conference in Seoul and indexed by DOE's OSTI database; the record lists two affiliations, PBMR Ltd. (Gauteng, South Africa) and Westinghouse Electric Company (Windsor, US), and its marker places Kriel with the second group (Westinghouse), not with PBMR Ltd. The name and field match the Deseret account, but no source read states that the Valar engineer is that author, and his other papers found under that name could not be read. Valar's own pages and public documents read do not name him, and no title for him at Valar was found in them or in the news reports read as of late September 2026. When he joined is not stated; Castle Valley Special Service District minutes of 19 February 2026 list him as present for Valar Atomics. For what became of PBMR, see ppl-015.

In plain termsDeseret News reports that a retired engineer, Willem Kriel, helps lead Valar's engineering. An engineer of the same name wrote about South Africa's earlier helium-cooled, TRISO-fuel reactor program, which would be relevant experience, but no source we read confirms they are the same person.
verified 2026-10-15: Re-read Deseret (both articles) and the OSTI record (HTML author markup). Fixed: the headline called him 'a veteran of South Africa's pebble-bed reactor program', which no source read states; the first draft gave his affiliation as PBMR Ltd., but the OSTI markup places the affiliation marker [2] (Westinghouse Electric Company, Windsor) after his name; date was the report date, now null (joining date unknown). A search found no readable source linking the two; login-only pages not used. Revised before publication (late September 2026): source excerpt shortened to the public-role words; note on unused sources shortened.

Code: ppl-007 · short link: valarwatch.com/ppl-007

In tabs: People, Safety Related Issues