Valar calls itself 'very open and transparent', pointing to its photos and video; of its Ward 250 safety papers, two were found published, and the others, most listed for DOE review, were not found in public records
In its unlisted 'Ward 250 By the Numbers' page (28 June 2026), Valar says its beliefs have led it to be 'a very open and transparent company', that its reactor has been more photographed and filmed than any other in history, and that it is sharing raw data to be refined by internal and external peer review over the following weeks. The page still contains placeholders ('July XX', '[xxx]') and one chart, 'Reactor Power Ascension', which plots an unlabeled 'Q_Total' on a 0-100 scale and thermocouple readings of about 30-80 F against a 'sample index', with no power units, dates or time scale, so it cannot be used to check the power reached. Of the safety documents the NSDA and DOE records name for Ward 250, two were found published by Valar: the NSDA (marked 'Draft', though the Valar page that posts it says DOE has approved it) and the QA Program Description. Not found among Valar's published documents as of late September 2026: the PDSA, final DSA and Technical Safety Requirements, the Code of Record (document 100437), the startup and commissioning plan, the radiation protection program (DOE's categorical exclusion summarizes its dose limits), the transport QA program (document 100719, which DOE approved) and any emergency plan (the NSDA proposes on-site emergency response only, with no off-site planning, coordinated with local responders). The NSDA lists the safety analyses, operating limits, startup plan and safety programs as submittals to DOE; no requirement to post them publicly was found in the NSDA or in DOE's authorization standard, DOE-STD-1271. The Physical Security Plan and Material Control and Accountability Plan are security documents, which the NSDA calls separate controlled documents. County and state officials praised Valar's openness at the Trust Lands hearings.
- Ward 250 By the Numbers (unlisted company page with placeholders, signed Isaiah Taylor) (Valar Atomics (Isaiah Taylor), 2026-06-28) primary company “These beliefs have led us to being a very open and transparent company.”
- Reactor Power Ascension: TE3401 thermocouples with Q_Total, Power, and Control Bank overlays (chart image on the draft page) (Valar Atomics, 2026-06-28) primary company
- Ward250 Nuclear Safety Design Agreement, No. 100403, Rev 02 (status: Draft; issued for Public Release) (Valar Atomics, 2025-10) primary company
- Issuance of Quality Assurance Program Approval 0049 (Rev 1) for Valar Atomics, memorandum to Robert Boston, Manager, Idaho Operations Office (U.S. Department of Energy, Office of Packaging and Transportation (Packaging Certification Program), 2026-05-18) primary government
- Ward250 Nuclear Safety Design Agreement (Valar library page, 13 Oct 2025) (Valar Atomics) primary company “The Department of Energy has approved the Nuclear Safety Design Agreement (NSDA)”
- NEPA Determination DOE-ID-26-005: Valar Ward250 Research Reactor (categorical exclusion B5.26) (U.S. Department of Energy) primary government “implements the Ward 250 Radiation Protection Program (RPP) in accordance with 10 CFR 835”
- DOE-STD-1271-2025, Authorization Pathway for Nuclear Facilities (August 2025; DOE standard, copy posted by the Nuclear Innovation Alliance) (U.S. Department of Energy (copy posted by the Nuclear Innovation Alliance)) primary government “The Contractor provides the startup and commissioning plan in conjunction with the submittal of the DSA.”
- 08.20.2026 FINAL TLA Minutes (Utah Trust Lands Administration (Utah Public Notice Website)) primary government “He praised Valor’s openness and extensive public”
In tabs: Safety Related Issues, Public Process, Origins