VALAR WATCHTake action

How big is Ward 250? 100 kW day to day; 250 kW for one hour per run (safety paper) or 'up to one day', possibly a total (unfinished Valar page); '5 MW' in airlift news

unresolvedtechnical

What was said

What the record shows

The gap: The safety paper allows 250 kW for one hour per run; an unfinished, unlisted Valar page from June 2026 says up to one day. Read as a total across runs, the two can fit; read as one continuous day, it is 24 times the paper's limit. Neither says which, and the paper itself is not uniform: its performance objectives (page 8) include 'steady-state operation at power levels up to 250 kWth'. The approved limits were not found in public records as of 17 October 2026. The difference could reflect limits set in the final safety analysis, whose approval on 23 April 2026 POWER reported and a DOE slide prepared for the NRC Commission's 21 July 2026 meeting lists, or an error in a draft page. The same DOE deck gives both figures without calling either a limit: its Valar slide lists 'July 2, 2026 – full power 100 kWt full power achieved', and a back-up slide of the program's selected reactors describes Ward250 as a '~250 kWt' reactor. DOE's description of a '250 kilowatt thermal (kWth)' reactor matches the paper's own '≤250 kWth' rating and is not a conflict, and Valar staff called the 100 kW limit 'full power'. The '5 MW' in airlift coverage appears, as reported, to come from the airlift's federal publicity and the design's planned future size, not from Valar's own words.
In plain termsA reactor's 'size' can mean what it runs at day to day or the most it may reach in a short test. Ward 250's safety paper says 100 kilowatts of heat day to day and 250 kilowatts for no more than an hour per run, and calls it a reactor of 'up to 250' kilowatts; that is why DOE calls it a 250-kilowatt reactor, and why Valar staff call 100 kilowatts 'full power.' Those fit together. Two things may not. An unfinished Valar web page says 250 kilowatts is allowed for up to a day; read as a total across runs, that can fit, but read as one continuous day, it is 24 times the paper's limit, though the same paper also sets a goal of steady operation at up to 250 kilowatts. And airlift news called it 5 megawatts, a figure that appears to come from the military's publicity and from the size the design is meant to grow to. A DOE slide deck shown to federal regulators in July 2026 lists both figures, full power of 100 kilowatts on 2 July and about 250 kilowatts in a list of the program's selected reactors, without saying which is a limit. The limits DOE actually approved would settle the hour-or-day question; they were not found in public records as of 17 October 2026.

Why it matters: Power and time at power set how much heat and radioactivity the reactor makes; the limits DOE actually approved were not found in public records as of 17 October 2026, and the company's unfinished page and its safety paper give different figures that may or may not conflict.

What would settle it: FOIA to DOE Idaho Operations Office for the Technical Safety Requirements, any approval to exceed 100 kWth, and the Ward 250 operating logs; ask Valar to publish the authorized limits.

Other sources for this entry:

facts safe-008, orig-031, orig-011, gov-027, orig-030, safe-001 · checked 2026-10-17: Checked for fairness to Valar, late September 2026: NSDA exec summary ('≤250 kWth') explains DOE's 250 kWth; ETV Price council (Gardner: 'full 100-kilowatt limit'); ExecutiveGov attributes the 5,000-homes description to 'DOW', and Stripes cites a Pentagon release (the war.gov article linked from both could not be read). The one-day claim is on an unfinished, unlisted draft page. Moved to unresolved: the only surviving difference (hour vs day) has a plausible reading (later-approved limits) that only the Technical Safety Requirements, not found in public records, can settle. Summary line literally true (NSDA p. 25; the draft page is online). | Earlier check: Re-read in late September 2026: By the Numbers (quotes exact), CX p. 1, NSDA web summary, NSDA pp. 2, 25, 52, ANS, POWER, WNN, Stars and Stripes, ExecutiveGov, Utah lab page. The 5 MW figure in the airlift articles is not attributed to Valar or DOE in the text read; it is recorded as press wording. | Revised before publication (late September 2026): gap, plain and summary line now read the paper's hour as per run and the page's day as possibly a total (24 times only if continuous). | Revised before publication (late September 2026): source title parenthetical now 'not listed in Valar's library'; framed as a difference that may or may not be a conflict (per-run hour vs possibly cumulative day); verification wording updated ('summary line').

Code: disc-006 · short link: valarwatch.com/disc-006