VALAR WATCHTake action

'Raw and uncleaned' data for 'external peer review', said an unfinished, unlisted Valar page in June; the only data is one chart without power units or times

unresolvedtechnical

What was said

What the record shows

  • The page shares one chart, 'Reactor Power Ascension', plotting a 0-100 'Q_Total' with no units, and thermocouple readings of about 30-80 F, against a 'sample index' with no dates or times; the page is unlisted and still carries placeholders ('July XX', '[xxx]') (plan-007).
  • Valar's library page lists no later data release or peer-review result as of late September 2026.
    Library (Valar Atomics)
  • The page carrying the promise is unfinished and unlisted: it breaks off mid-sentence ('This aspect', 'All of these'), keeps placeholders ('made power on July XX', '[xxx]') and is not listed in Valar's library (orig-071). It may be a draft never meant for release.
The gap: The promise sits on a page that is unfinished and unlisted in Valar's library, so it may be a draft never meant to be read, which is a plausible simplest reading. But it is live at a public address under the CEO's name, and as of late September 2026 no reviewed data, and no other data release, was found on Valar's site.
In plain termsOn an unfinished page dated June, Valar's founder wrote that the company was sharing its raw reactor data and would have outsiders check it over the following weeks, as part of being 'a very open and transparent company.' The page was never finished or listed in Valar's library, so it may be a draft that was never meant to go out. But it is on Valar's public website under his name. What it actually shows is one chart whose power line has no units, with no dates and no time scale, so no one can tell from it how much power the reactor made or when. As of late September 2026, no checked data was found on Valar's site or in other records read.

Why it matters: Independent review of real operating data is the best way for the public to know what the reactor does; an unfinished Valar page said it would come, and none was found as of late September 2026.

What would settle it: Valar publishing the power, temperature and radiation data with units and times, and naming its external reviewers; FOIA to DOE Idaho Operations Office for the operating logs.

facts safe-040, plan-007, orig-071 · checked 2026-10-15: Checked for fairness to Valar, late September 2026: re-read the page (truncated sentences, placeholders; not listed in the library per orig-071). The draft reading is plausible and weakens 'promised'; the page is nonetheless public and no data release has followed. Status changed from 'claim unsupported' to 'unresolved'. Summary line rewritten to call the page a draft and say what it shares. | Earlier check: Re-read in late September 2026: By the Numbers page (quotes exact; placeholders present), chart per plan-007, library page (five listed posts, no data release). | Revised before publication (late September 2026): listing wording now 'not listed'; verification wording updated.

Code: disc-052 · short link: valarwatch.com/disc-052